Scaling problems solved: Gas output up 160%, oil up 336%
|
|
|
|

Scale problems were causing exhorbitant stripping costs and interrupting production. After a 2-day process, Reef returned the well to production with gas production up 160% and oil production up 336%.
|
|
Read more...
|
|
Expensive hot oil treatments eliminated
|
|
|
|

Paraffin was plugging down-hole pumps and tubing until Reef Services arrived with its PAS-310, paraffin asphaltene solvent and eliminated the need for hot oil treatments.
|
|
Read more...
|
|
Sporadic gas production cured by Reef Services
|
|
|
|

This customer's gas wells produced sporadically, then zoomed down to near-zero production. The situation was cured by Reef field services, GRS-1030, a gas well production enhancer, and Iron-Out, an iron sulfide remover.
|
|
Read more...
|
|
100% frac fluid recovery sweetens gas well returns
|
|
|
|

A gas well in the Atoka formation jumps from 10 MCFD to 60 MCFD and nets a return on investment in just 9 days thanks to GasPlusD.
|
|
Read more...
|
|
Reef mud treatment eliminates $1M in costs
|
|
|
|

Mud was making a mess of things for this Arkansas aggregate producer, adding $1 million in disposal costs. Now, the client’s wet mud issues are history and ROI tops $1.2 million a year.
|
|
Read more...
|
|
Fluid recovery skyrockets in the Barnett Shale
|
|
|
|

This Barnett Shale well produced 1 to 10 MCFD until Reef was called in. After Reef pumped in GasPlus D, the well now produces a consistent 90 MCFD. The customer’s return on investment occurred in just 4 1/2 days.
|
|
Read more...
|
|
Dead well comes alive with Reef Services
|
|
|
|

This Woodford Shale gas well had been unproductive for 5 years when the owner called in Reef Services. Extensive testing and analysis returned the well to production. Reef’s costs were paid in 72 days. Reef products used: GasPlus gas production enchancer, IronOut iron sulfide remover, and ReGas-100 Gas Well Acid System.
|
|
Read more...
|
|
GasPlus pays out in half a day
|
|
|
|
Reef provided the analysis, service and products that made this gas well in the Permian Basin pay out in less than 12 hours. The well continues to pump at levels exceeding previous levels. Reef products used: GasPlus gas production enchancer and AF-5020 multifunctional foamer.
|
|